Drawdown & Recovery Calculator
Measure peak-to-trough damage and how much edge you need to climb back to the high-water mark.
Formula:recovery% = DD% ÷ (100 − DD%)
Inputs
high-water
per win, for win count
optional cash path
Results
Drawdown
12%
Absolute DD
$12,000.00
Recovery needed
13.64%
Wins to recover
7
Wins ($ path)
24
Back to peak $
$12,000.00